January 2023 Update

  • dwweerts
  • Jan 14, 2023
  • 1 min read

Updated: Aug 14, 2023

Recent developments:

  • The floor plan is starting to take shape as the interior wood walls are being laid out and framed.

  • Northwest interior slab poured

  • Steel beam over open work area installed.